by jw | Jan 6, 2023
ExCel Centre Phase II About The Excel Exhibition Centre was extended in 2010 expanding the original facility by 50%. The coating systems to 8000 tonnes of steel were re-instated following damaged caused during transport and erection. Hundreds of uncoated splice...
by jw | Dec 14, 2022
5 Canary Wharf London About This project in the heart of London involved the full encapsulation, shot blasting and spray application of a multi coat corrosion protection system. The residue of the blasting operation was known to have a lead content which required...
by jw | Dec 2, 2022
West Handyside Canopy Kings Cross About This project in the heart of London involved the full encapsulation, shot blasting and spray application of a multi coat corrosion protection system. The residue of the blasting operation was known to have a lead content which...