ExCel Centre
Phase II
About
The Excel Exhibition Centre was extended in 2010 expanding the original facility by 50%. The coating systems to 8000 tonnes of steel were re-instated following damaged caused during transport and erection.
Hundreds of uncoated splice plates were mechanically prepared and primed with a surface tolerant product before application of the build and finish coats. The signature roof trusses presented a particular challenge and had a two coat polyurethane finish coat system applied by rope access technicians.
Client
Abu Dhabi National Exhibitions Company
Architect
Grimshaw
Main Contractor
Sir Robert McAlpine Ltd
Fabricator
Severfield Reeve
Scope
Remedial works to offsite applied coating systems
Package Value
£220,000