ExCel Centre

Phase II

About

The Excel Exhibition Centre was extended in 2010 expanding the original facility by 50%. The coating systems to 8000 tonnes of steel were re-instated following damaged caused during transport and erection.

 
Hundreds of uncoated splice plates were mechanically prepared and primed with a surface tolerant product before application of the build and finish coats. The signature roof trusses presented a particular challenge and had a two coat polyurethane finish coat system applied by rope access technicians.

Client

Abu Dhabi National Exhibitions Company

Architect

Grimshaw

Main Contractor

Sir Robert McAlpine Ltd

Fabricator

Severfield Reeve

Scope

Remedial works to offsite applied coating systems

Package Value

£220,000