Battersea Power Station
Phase 1
About
Having successfully negotiated the first phase of this high profile project, IPCL are currently installing a range of Rockwool products designed to achieve the acoustic and fire performance requirements on this unique building.
The design and complexity of some of the services passing through the compartment walls has resulted in bespoke product installation details being developed and approved alongside Rockwool in order to meet the clients’ requirements.
Client
BPSDC
Architect
dRMM Architects
Main Contractor
Skanska
Scope
Fire stopping and acoustic sealing to wall penetrations
Package Value
Ongoing