Manchester Royal

Infirmary

Client: Central Manchester University Hospitals NHS Trust

Architect: Anshen Dyer

Main Contractor: Bovis Lend Lease

Scope: Fire stopping and acoustic sealing to service penetrations and air sealing to perimeters and intumescent coatings

Package Value: £3.8million

Working on this project over a three year period, IPCL undertook a range of works including intumescent coatings, fire boarding, fire stopping, acoustic and air sealing, and mastic joints. The construction duration of this state of the art hospital gave the opportunity to recruit and train a local workforce to work alongside our established management and supervision team. Many of the operatives are still with us and have risen to be supervisors themselves. Liaison with trades including curtain walling, dry-lining, M&E and Suspended Ceilings was imperative to ensure works were carried out in sequence to minimise damage to installed firestopping by others.

Head Office

2 Jupiter Court, Orion Business Park,

North Shields, Tyne & Wear, NE29 7SN

T: 0191 2728225

sales@ipcl.co.uk

London Office

27 Old Gloucester Street, London WC1N 3AX

T: 0207 305 5822

Copyright © 2016 IPCL